Sit comfortably and watch how to properly build a house.
And now all that remains is to move into the new house...
Comfortable dwelling also for your cars
The house terrace provides a wonderful view towards the countryside.
The facade is complete. Completion of PSV works, painting, laying of flooring etc. are being performed inside the family house.
Thermal insulation system, incl. the adhesive and reinforcement - prepared for the external facade
Heat cladding of the building skin
Installation of plastic windows - decoration, 5-chamber profile
House roof - performed insulation by foil. It is prepared for metal sheeting of the attic and bringing of gravel. Finishing of the rough construction and its preparation for winter resistance.
Heat cladding of the roof shell - roof insulation performance - foil
Ceiling of 2nd aboveground floor of the building
Finishing of the masonry of 2nd NP
Foundation and walling of masonry of 2nd floor family house
Treatment of the concrete slab - sprinkling
Concreting of ceilings - ceiling slab made of cast-in-situ concrete
Completion of the laying of ceilings
Beginning of the assembly of Porotherm ceilings
Completion of the masonry of 1st floor and the preparation for laying of ceilings
Masonry of 1st floor of a family house
Walling of 1st floor of the building
Horizontal insulation against underground moisture and radon - foundation of masonry
Rough grading, incl. compaction
Foundation slab of the house
Connection of sewerage to the main line, sewer and water-metering installation
Rammed earthwork in the space between the wall footings
Horizontal distribution of sewer nets in the substructure
Wall footing after removal of shuttering
Shuttering of the wall footing over the level of the terrain
Concreting of wall footing up to the level of the terrain
The first step of construction is the earth works
This is how the construction of a house always begins